McGavock Pike Demonstration Project
McGavock Pike Demonstration Project
The Nashville Department of Transportation and Multimodal Infrastructure (NDOT) will be installing a temporarily demonstration project for McGavock Pike from Fernwood Dr to Riverwood Dr on July 7 until July 10. The demonstration will use traffic cones and signs to test a design that narrows the eastbound lane of McGavock Pike to create protected space for people to walk, bike, and roll. It will also close the slip lane from McGavock Pike to Riverwood Drive. This project aims to make the corridor safer and more accessible for everyone.
Plans for 4-day pop-up on McGavock Pk to create designated pedestrian space.
Access point to Riverwood Dr from McGavock Pk during lane closure.
This is hidden text that lets us know when google translate runs.